Solar

Submittals:

  • Building Permit Application
  • Electrical Permit Application
  • Construction Plans including:
    • Seal by MN Engineer
    • Panel layout
    • Setbacks
  • Site Plan
  • Manufacturer details and insulation requirements for all components
    • UL listing specifications for panels and inverters
    • Rack mounting details and calculations
    • Locations and labels for compliance with NEC 690

Typical Inspections:

Contractor must be on site to provide access.

  • Electrical Final
  • Building Final