Demolition

This handout is a compilation of some of the standard requirements based on the State Building Code and City Ordinance for projects of this type. This information packet does not contain all the specific codes for construction and should only be used as a guide. The permittee is responsible for meeting all code requirements applicable to each project.

Note: If home is a Heritage Preservation Site prior approval from City Planner and/or HPC is required before issuance of permit.

 

Submittals

 

Required Inspections

  • Pre-demolition inspection: Before structure is demolished, verify all personal property and hazardous materials have been removed, and utilities have been disconnected. See attached Demolition Environmental Checklist.
  • Open hole inspection: Verify all materials have been removed from the site.
  • Sewer/water capped at property line.
  • Final: grade and groundcover established.

 

Typical Requirements for Demolition

  • Permit applicant must obtain a city license which requires a certificate of insurance covering worker’s compensation and public liability insurance policy in the amount of at least $50,000.
  • Contact Gopher State One Call (811) before you begin excavation and demolition.
  • Disconnect and properly abate all utilities connected to the property. Obtain disconnection verification from each utility:
    • Electrical (Xcel or Dakota Electric): Electrical contractor required to complete the disconnect.
    • Water & Sewer (Building Safety Department): Contractor with pipelayers bond or plumbing license is required. Lines to be cut and capped at the property line. (651)480-2342
    • Water Meter (Public Works Department): Final meter reading and collection of meter. (651)480-6185
    • Gas (CenterPoint)
    • Communications (CenturyLink, Comcast, etc.)
  • Install and maintain erosion control measures for the site.
  • No obstruction of sidewalks or streets is allowed unless prior written approval from the City Director of Public Works is received.
  • Remove all debris including foundation walls, footings, and basement floor.
  • Review MCPA’s handout for additional demolition requirements: 
  • No demolition refuse shall fall more than 15 feet unless in an enclosed chute.
  • Removal of all debris and reclamation of the property must be completed within approved time frame.
  • Fill in and level site, restore grade, and seed to match adjoining contours.